Installation Guide

  • Prior to installation, inspect the site. It should be free from any type of shadow be it of a tree or any man-made structure.
  • Collector/Tube should be placed facing south only.
  • Across the selected site, the installation spot should be selected such that as to minimize the piping length.
  • If you are installing system on the roof, make sure that for truss system can support the weight of the system filled with water.
  • All the support structure of tank and collector has to be properly grouted; it protects the system against high velocity wind and physical disturbance.
  • Air vent arrangement/Air breather pipe is must for all the system and it has to be placed at proper level, otherwise it may damage the system and for which the company will not take any liability.
  • Use only recommended size of pipes for external-hot-water piping.
  • Use insulated metal pipe or CPVC pipe only for piping for external-hot-water distribution.
  • In case of pressurized system, ensure proper installation and setting of temperature, pressure and Vacuum Valves.
  • The backup electrical system consisting of heater, thermo-state, MCB etc…. should be installed by trained electrician with proper earthling arrangement.